| Home : Commercial / Agricultural | printer-friendly view |
Commercial / Agricultural
![]() |
|
||||||
Energy Management Programs |
| Protect the Business you Built | |
| Energy Grants and Rebates | |
| Stray Voltage Testing |
Energy Grants, Rebates, & Lighting Programs
Energy Grants and Rebates are available to C&I accounts including businesses, industrial and process plants, schools, institutions, governments and agricultural. Grant and Rebate funds are available for but not limited to the following types of electric equipment: lighting, premium efficient motors, adjustable speed drives, compressed air systems, refrigeration, HVAC, controllers for beverage machines and door heaters on refrigerated cases, well water pre-cooler and waste heat exchangers for dairy equipment. Where applicable, it is recommended that ENERGY STAR® qualified products be implemented. See www.energystar.gov for current product listing and criteria. Backup generator and power factor correction projects are not eligible. Equipment installed to improve energy efficiency must maintain a minimum power factor of 90%.
The C&I Custom Energy Grant program provides funds to qualifying customers for installing energy efficient electric equipment in retrofit or new installations. The program is intended to encourage projects that best meet the unique needs of each customer. The C&I Custom Energy Grant may not be used to rebate equipment for which GRE has already developed a specific rebate amount. The new/proposed energy efficient project must meet or exceed the current city, state or federal energy code. Please contact Meeker Cooperative Light and Power Assn. for Grant criteria.
Stray Voltage Testing
Neutral to Earth Voltage (NEV) and Electro-Magnetic Fields (EMF) shall be investigated by the cooperative to assist the member in evaluating the levels present, identifying possible sources and provide resource information to correct NEV and/or EMF. Cooperative personnel may require the member’s electrician be available to assist in the investigations and evaluate on-farm wiring for potential sources of NEV voltage. The member shall be responsible for the cost of the electrician, for correcting any deficiencies and/or repairs to the member’s wiring or equipment. To reduce primary NEV at a point where the primary neutral and secondary neutral interconnect, the Cooperative may provide a special non-standard service (Blocker Service). Please contact Meeker Cooperative Light and Power Assn. for further details.







