NOTE: FOR NEW SERVICES OR UPGRADES TO EXISTING SERVICES WHERE THE TRANSFORMER KVA REQUIREMENT WILL BE 350 KVA OR GREATER, PLEASE CONTACT MEEKER COOPEREATIVE FOR SPECIFIC EQUIPMENT LEAD TIMES AND ELECTRIC RATES.

Small Single-Phase Power (Rate Code 01, 02)

Available for single phase service for all uses subject to Meeker Cooperative rules and regulations and execution of an Application for Membership and Electric Service.

If the metered monthly demand exceeds 20 kilowatts (kW) for nine of the past 12 months, the member’s bill will be calculated under the Large Single-Phase Rate Schedule until such a time that the member’s kW demand is less than 20 kW for 12 consecutive months.

The maximum current during startup of individual motors served under the schedule shall not exceed 260 amps at 240 volts as authorized in advance by Meeker Cooperative. Service is subject to the rules and regulations of MCLP. 

Monthly Rate

Fixed charge – $43.00

Energy Charge

June – August – $.123/kWh

Other Months – $.103/kWh

Demand Charge – $0.00/kW

*plus applicable sales tax

Minimum Charges

The standard size transformer for the Small Single-Phase service is 15 Kilovolt-amp (kVA). Your electric service may require a larger transformer than a 15 kVA unit because of the type of equipment you have connected, for example a welder, grain dryer, or any equipment with a large electric motor(s). Meeker Co-op will install the transformer needed to meet your electric needs.

Minimum Monthly Charge: The minimum monthly charge for Small Single-Phase Power is the $43 per month where the required transformer is 15 kVA or less. For members services requiring additional transformer capacity, the minimum monthly charge shall be:

25 KVA transformer……….$47.00

37.5 KVA transformer…….$62.00

50 KVA transformer……….$77.00

75 KVA transformer……….$107.00

100 KVA transformer……..$137.00

Power Cost Adjustment (PCA)

The PCA is a charge or credit on your monthly bill to pass through increases or decreases in the cost of purchased power. The PCA is applied to the kWh usage and is listed as a separate line item on your bill. The PCA applies to all general service rate classes except energy management rate programs.

PCA – $.0112/kWh

Large Single-Phase Power (Rate Code 03)

Available for single phase service for all uses subject to Meeker Cooperative Light & Power (MCLP) rules and regulations and execution of an Electric Service Agreement.

To qualify for service under this schedule, the monthly metered kilowatt (kW) demand must exceed 20 kW for nine of the past 12 months. If the metered kW demand is less than 20 kW for nine of the past 12 months, the member’s bill will be calculated under the Small Single-Phase Rate Schedule.

The maximum current during startup of individual motors served under the schedule shall not exceed 260 amps at 240 volts as authorized in advance by MCLP. Service is subject to the rules and regulations of MCLP. 

Fixed Charge — $115

Demand Charge

June, July, August — $9.95/kW

Other months — $6.95/kW

Billing demand for the month shall be the maximum recorded 15-minute interval demand in kilowatts (kW).

Energy Charge — $.08/kWh plus Power Cost Adjustment

Minimum Monthly Charge: The minimum monthly charge shall be the $93 fixed charge, plus the Special Construction Charge, if applicable, plus $1.20 per KVA of installed transformer capacity in excess of 25 KVA of transformer capacity.

Plus applicable sales taxes

Small Three-Phase Power (Rate Code 4)

Available for all farm, home, and commercial uses, except irrigation, which requires multi-phase service subject to Meeker Cooperative Light & Power (MCLP) rules and regulations and execution of an Electric Service Agreement. 

To qualify for this service under this schedule, the kilowatt kW) demand must not exceed 20 kW for more than three of the past 12 months. If the monthly metered kW demand exceeds 20 kW for more than 3 of the past 12 months, then the member’s bill will be calculated under the Large Three Phase Rate Schedule.

Fixed Charge — $88.00

Energy Charge

June, July, August — $.123/kWh plus Power Cost Adjustment

Other months — $.103/kWh plus Power Cost Adjustment

Demand Charge – $0.00/kW

Minimum Monthly Charge: The minimum monthly charge shall be the $71 fixed charge for installations not to exceed 15 KVA of transformer capacity. For services requiring more than 15 KVA of transformer capacity, the minimum shall be increased by $1.20 per KVA of installed transformer capacity in excess of 15 KVA.

Plus applicable sales taxes

Large Three-Phase Power (Rate Code 5)

Available for all farm, home, and commercial uses, except irrigation, which requires multi-phase service subject to Meeker Cooperative Light & Power (MCLP) rules and regulations and execution of an Electric Service Agreement. 

To qualify for service under this schedule, the monthly metered kilowatt (kW) demand must be greater than 20 kW for more than three of the past 12 months. If the monthly metered kW demand is equal to or less than 20 kW for twelve consecutive months, the member’s bill will be calculated under the Small Three Phase Rate Schedule. Service is subject to the rules and regulations of MCLP. 

Fixed Charge — $145

Demand Charge

June, July, August — $9.95/kW

Other months — $6.95/kW

Billing demand for the month shall be the maximum recorded 15-minute interval demand in kilowatts (kW).

Energy Charge — $.08/kWh plus Power Cost Adjustment

Minimum Charge: The minimum monthly charge shall be the $118 fixed charge, plus the Special Construction Charge, if applicable, plus $1.20 per KVA of installed transformer capacity in excess of 25 KVA of transformer capacity.

Plus applicable sales taxes

Large Power Peak Alert: 350 kVA Transformer or larger (Rate Code 7)

Available for general service where the required transformer is 350 kVA or more. Under this service, the load must be reduced to zero or to a pre-determined demand level (PDL) during load control demand response periods as determined by MCLP.  This can be accomplished with or without standby generation.

Fixed Charge — $306

Demand Charge – $5.75/kW all months

The base demand shall be the maximum kilowatt demand (subject to power factor adjustment) established by the member for any period of 15 consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter.

Coincidental Demand Charge – $19.63/kW

The member must reduce their demand to zero or to the PDL for the entire duration of a demand response period(s). If in a month the member fails to reduce the load to zero or to the PDL during the demand response period(s), the coincidental demand charge will be invoked. The coincidental demand charge will be added to the peak period demand that exceeds zero. The excess demand charge will be added to the peak period demand that exceeds the PDL for the partial interruptible alternative. The coincidental demand charge is applied once per month.

Energy Charge — $.051/kWh plus Power Cost Adjustment

Plus applicable sales taxes

Enrollment: If standby generation is installed, it is every generation owner’s responsibility to review the Environmental Protection Agency’s (EPA) Reciprocating Internal Combustion Engine (RICE) rules and ensure their generator(s) comply with the rules applicable to non-emergency engines. This is a voluntary program and the member is responsible for ensuring that the service load is shed during the demand response period determined by Meeker Cooperative.

Opt-Out: The member may opt out of the interruptible program. Selecting the opt-out option will remove the member from participation in the program for a period of no less than one year and also any rate cost savings associated with the Large Power Peak Alert rate. The member will then be placed on the applicable rate schedule as determined by MCLP. At the end of the opt-out year, the member will have the option of returning to the program after having provided a 60-day notification.  The notification must either be by  letter to Meeker Cooperative or by email to customerservice@meeker.coop

Large Power Peak Alert: 50 kVA – 350 kVA (Rate Code 71)

Available for general service where the required transformer is 50 kVA – 350 kVA. Under this service, the load must be reduced to zero during demand response periods as determined by MCLP.  This can be accomplished with or without standby generation.

If standby generation is installed, it is every generation owner’s responsibility to review the Environmental Protection Agency’s (EPA) Reciprocating Internal Combustion Engine (RICE) rules and ensure their generator(s) comply with the rules applicable to non-emergency engines.

Fixed Charge — $145

Demand Charge – $0.00/kW

The base demand shall be the maximum kilowatt demand (subject to power factor adjustment) established by the member for any period of 15 consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter.

Coincidental Demand Charge – $19.63/kW

The member must reduce their demand to zero for entire duration of a demand response period(s). If in a month the member fails to reduce the load to zero during the demand response period(s), the coincidental demand charge will be invoked. The coincidental demand charge will be added to the peak period demand that exceeds zero. The coincidental demand charge is applied once per month.

Energy Charge — $.070/kWh plus Power Cost Adjustment

Plus applicable sales taxes

Enrollment If standby generation is installed, it is every generation owner’s responsibility to review the Environmental Protection Agency’s (EPA) Reciprocating Internal Combustion Engine (RICE) rules and ensure their generator(s) comply with the rules applicable to non-emergency engines. This is a voluntary program and the member is responsible for ensuring that the service load is shed during the demand response period as determined by Meeker Cooperative.

Opt-Out: The member may opt-out of the interruptible program. Selecting the opt-out option will remove the member from participation in the program for a period of no less than one year and also any rate cost savings associated with the Large Power Peak Alert rate. The member will then be placed on the applicable rate schedule as determined by MCLP. At the end of the opt-out year the member will have  the option of returning to the program after having provided 60-day notification.  The notification must either be by  letter to Meeker Cooperative or by email to customerservice@meeker.coop

Crop Irrigation (Rate Code 6)

Available to all members requiring service to pumps and irrigation equipment subject to Meeker Cooperative rules and regulations and execution of an Electric Service Agreement.

Monthly Fixed Charge: May – September — $145

Demand Charge$25.50/kW based on highest 15-minute demand which occurred during the month.

Controlled Irrigation Demand Credit

Members who permit Meeker Cooperative to control pumps and irrigation load during demand response periods shall receive a credit of $20.50/kW applied against the monthly demand charge for each month of the irrigation season. This is a voluntary program and the member is responsible for ensuring that the service load is shed during the demand response period as determined by Meeker Cooperative.

Energy Charge

All months — $0.09/kWh plus Power Cost Adjustment

Non-Control Penalty / Coincidental Demand Charge

Irrigation operators and/or irrigation equipment that fail to control irrigation systems over during the demand response period(s)  will be charged the full monthly demand charge based on coincidental wholesale demand (Coincidental Billing Demand). Coincidental Billing Demand shall be defined as the member’s highest 15-minute kW demand that coincides with the Co-op’s monthly peak as determined by the wholesale power providers.

  • Non-Control Penalty – $5/kW demand charge based on the highest 15-minute demand which occurred during the load control period.
  • Supplemental Demand Charge – $19.71/kW demand charge based on the highest hourly demand which occurred coincident to the wholesale power suppliers monthly billed demand.

Plus applicable sales taxes

Wastewater Irrigation (Rate Code 63)

Available to all members requiring service to pumps and irrigation equipment subject to Meeker Cooperative rules and regulations and execution of an Electric Service Agreement.

Monthly Fixed Charge — $145

Demand Charge$25.50/kW based on highest 15-minute demand which occurred during the month.

Controlled Irrigation Demand Credit

Members who permit Meeker Cooperative to control pumps and irrigation load during demand response periods shall receive a credit of $20.50/kW applied against the monthly demand charge for each month of the irrigation season. This is a voluntary program and the member is responsible for ensuring that the service load is shed during the demand response period as determined by Meeker Cooperative.

Energy Charge

All months — $0.09/kWh plus Power Cost Adjustment

Non-Control Penalty / Coincidental Demand Charge

Irrigation operators and/or irrigation equipment that fail to control irrigation systems over during the demand response period(s)  will be charged the full monthly demand charge based on coincidental wholesale demand (Coincidental Billing Demand). Coincidental Billing Demand shall be defined as the member’s highest 15-minute kW demand that coincides with the Co-op’s monthly peak as determined by the wholesale power providers.

  • Non-Control Penalty – $5/kW demand charge based on the highest 15-minute demand which occurred during the load control period.
  • Supplemental Demand Charge – $19.71/kW demand charge based on the highest hourly demand which occurred coincident to the wholesale power suppliers monthly billed demand.

Power Factor Adjustment

The member agrees to maintain as near unity power factor as practicable. MCLP reserves the right to measure such power factor at any time.  Should such measurements indicate that the average power factor is less than 90 percent, the demand for billing purposes shall be the demand as recorded by the demand meter multiplied by 90 percent and divided by the percent power factor.

NOTE: All rates are subject a Power Cost Adjustment (PCA). The PCA is a charge or credit on your monthly bill to pass through increases or decreases in the cost of purchased power.

The Billing Demand for the month shall be the maximum recorded 15-minute interval demand in kilowatts (kW). The Coincidental Billing Demand shall be defined as the member’s highest 15-minute kW demand that coincides with Meeker Cooperative’s coincidental monthly peak as determined by the cooperative’s wholesale power providers.

NOTE: All rates are subject to applicable sales tax

Deposits

Small Single-Phase, Small Three-Phase Services: Every new service application requires a soft credit check from On-Line Utility Services. If that check is negative, a $400 deposit (minimum) is required to obtain electric service. Deposits may be returned after 7 years if a member has attained a ‘B’ credit rating or greater, based on Meeker’s Cooperative’s credit rating system, thus demonstrating a good credit history. Deposit will be credited to the member’s account. Finance department will complete the analysis of deposits annually.

Large Single-Phase, Large Three-Phase, Large Power Peak Alert, Irrigation Services: A deposit of $20 times the total installed KVA shall be required on all Demand Billed accounts for any entity without good credit as determined by the Cooperative.


Security Lights

Available to all customers who want a driveway or yard illuminated from dusk to dawn by a high pressure sodium light on an existing pole. Meeker Cooperative will install and maintain your security light.

Rate (Billed monthly)

100 watt – Direct $10.75; Dispersed $14.75

250 watt – Direct $19.50; Dispersed $23.50

Decorative Lighting – 100 watt: $14.75
                                  250 watt: $23.50

All new installations will be LED lights.
73 watts: $10.75
108 watts: $19.50

Money Saving Energy Management Rates & Rebates